Equipment Specs
Content
Languages

Talk:Load Haul Dump Truck

From RitchieWiki

Comments on Load Haul Dump Truck

Name (required):

RitchieWiki direct contact: wiki@rbauction.com
Comment on article below...


LHD machine said ...

want to buy pl contact or reply.e-mail id - dnrout@vsnl.net

--LHD machine 00:13, 7 January 2009 (PST)

K.SUGUNAKAR REDDY said ...

Dear Sir, There are different mines in Singareni Collieries Company Limited, Andhrapradesh, India, with potential for Pillar extraction with Continuous Miner Technology; we are trying to collect some information in this regard to firm up the decision. Can you provide some information on the following issues:

1. In a geo-mining condition with seam thickness of 6-7m and seam gradient 1 in 5 or steeper – suitability of Continuous Miner - Shuttle car option ?? 2. If development is done along the apparent dip a. In any case, the CM or Shuttle car will be exposed to true dip at some point while crossing the gallery junctions – How will such problem be addressed? b. What will be role of transverse gradient while development & extraction of pillars in steep gradient seams? 3. What are the different methods of pillar extraction being practiced in India/ elsewhere in the world for pillar extraction by Continuous in similar condition? 4. Is there any case studies / publications available for any mine with similar geo-mining condition? Any how, we require high productive cutting and conveying equipment to work steeper than 1 in 5 (11 degrees).

Your comments on addressing the above issues are solicited.


--K.SUGUNAKAR REDDY 22:01, 3 February 2010 (PST)